SNOWFLAKE WORLD TOUR & SAP CONNECT

PROJECT 06/2024

Station Berlin – Corporate Event – Project Management

Attendees:

4600

Type:

Corporate Event

5 halls

Area(s):

PROJECT OVERVIEW

Two major tech conferences in the same location, with only one day break between them: Snowflake World Tour and SAP Connect 24 presented a double logistics challenge. Same internal production team, two external clients, parallel communication tracks, and the need to coordinate construction schedules so external service providers could work within our parameters.

Station Berlin was used in its entirety: Main stages in the large halls with multi-screen LED setups, several secondary program areas for breakout sessions, as well as an exhibition area for partner companies.

For SAP, a vertical neon-blue LED tube sculpture was installed as a visual statement piece. For Snowflake, a more organic wooden structure with hanging vegetation followed as a networking lounge – completely different aesthetics, same crew.

The construction schedule had to be precisely orchestrated: Snowflake dismantling on Monday, conversion on Tuesday, SAP setup on Wednesday. Rigging points were prepared for both events but equipped differently. Audio PA remained partially identical, video and lighting setup was completely exchanged. Catering flows, security zoning, and badge systems had to be coordinated separately, while technical infrastructure was shared.

​SPECIAL FEATURES

Back-to-back corporate event production with two completely different clients in a 72-hour turnaround. The challenge lay not only in technical transformation, but in parallel communication: Coordinating with Snowflake on their requirements while simultaneously finalizing SAP planning.

The internal team had to switch between two corporate identities, two branding guidelines, and two completely different design languages. Logistics coordination with service providers (AV, catering, security) had to run in a way that allowed them to perform their work within our time windows without affecting the other production.